In the recent "International Financial Report" "I and the Belt and Road" series of programs, many times introduced the company's participation in the project, the screen appeared many times the company's products, the company by virtue of excellent technology and service, in the industry to stand firm.
Uganda Isimba hydropower plant is located in Kampala, about 90 kilometers northeast of the capital city of Uganda (Kampala), Kayunga District (Kayunga), central Uganda, on the central Nile River, by the China Water Conservancy and Electricity Foreign Corporation to the "design, procurement, construction (EPC)" mode of construction, with a total installed capacity of 183MW, the project investment of about 556 million U.S. dollars, the China Exim Bank will provide financing support for the project. provide financing support for the project.
Our company provides equipment: HL120-3F2000L concrete mixing building, 2*1600kN bidirectional gantry, 2*630kN bidirectional gantry, 2*30kN cleaning machine.
Cambodia Sang River Grade II Hydropower Station is located on the main stream of the Sang River in the western mountainous area of Stung Treng Province in the northeast of Cambodia. The station has a total installed capacity of 400,000 kilowatts and adopts eight 50,000 kilowatts bulb through-flow units made in China. Its rated head and stand-alone capacity are among the top in the world in the same type of hydropower units, and it is the largest hydropower project in Cambodia. The dam of the power station is 6.5 kilometers long, which is the longest dam in Asia. The power station will provide Cambodia with 2 billion kWh of clean energy annually after it is fully commissioned in October 2018, and the total installed capacity will account for more than one-fifth of Cambodia's national power generation capacity.
Our company provides equipment: HL280--2S4000L concrete mixing building, HZ120--2S1500 concrete mixing plant
Uganda Karuma hydropower plant is located in northern Uganda on the White Nile River, about 270 kilometers away from the capital Kampala, the project content mainly includes dam, waterway system, underground plant and ancillary power output project, the design installed capacity of 600MW, is the largest hydropower plant in Uganda, using the "Design, Procurement, Construction (EPC)" way to implement the construction of China Hydroelectric Power Construction Group Corporation.
Our company provides equipment: HZ180-1S4000 concrete mixing plant, HZ60-1S1500 concrete mixing plant.
Pakistan Karot hydroelectric power station is Jhelum River (Jhelum) is located in Pakistan's Punjab province territory Karot bridge upstream, down from the Mangla dam 74km, west from Islamabad straight line distance of about 55km, the power station installed capacity of 720MW, the multi-year average annual power generation of about 3.210 billion degrees. The hub project consists of water retaining, water discharge, sand flushing and diversion power generation system and other main buildings, the barrage dam for the asphalt concrete heart wall earth and stone dams, the maximum height of the dam is 95.5 m. Karot Hydropower Station is the first large-scale investment in hydropower Belt and Road construction projects, but also the "China-Pakistan Economic Corridor" the first investment in hydropower projects, is so far the largest Three Gorges Group invested in the construction of hydropower projects in the largest greenfield overseas investment.
Our company provides equipment: HL115-3F1500L concrete mixing building, powder conveying system, vehicle scheduling system and so on.