Kinbusanga, Congo Hydropower Station is located on the Lualaba River in the southern region of the Democratic Republic of Congo. It is approximately 410km away from Lubumbashi city and 70km away from Kolwezi city in a straight line. The total length of the road is about 110km. The dam site of Busanga hydropower station is located 1.3km upstream of the exit of N'zilo Busanga canyon, and is the last cascade of four planned hydropower stations (N'Zilo I, N'zilo II, N'Seke, and Busang) in the canyon section. The Kinbusanga, Congo Hydropower Station is a hybrid development mainly focused on power generation, with a total installed capacity of 240MW (60MW per unit). Two HL240-2S3000L hydraulic pre cooled concrete mixing plants and their ancillary equipment are configured for the concrete production system of Kinbusanga, Congo Hydropower Station. One set of 2 × 250/150kN one-way gantry crane is also supplied in this project.They are designed, manufactured, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd.