The Nam Ou River Cascade Hydropower Station project in Laos will be developed in two phases according to the "one reservoir and seven stages" plan, with a total installed capacity of 1.272 million kilowatts and an average annual power generation of about 5 billion kilowatt hours. At present, all seven level hydropower stations have been put into operation for power generation, which will ensure 12% of Laos' electricity supply and help Laos build a "Southeast Asian battery".
Our company has provided a total of 6 sets of 2 × 1600kN one-way gantry cranes and other gantry crane equipment, as well as one set of HL240-2S3000 mixing tower and one set of HL240-2S3000 mixing tower, for the first and fourth level hydropower stations on the Nanuojiang River; Provide one set of 175+175/10t bridge crane for the fifth level hydropower station on the Nan'ou River, and one set of 150+150/10t bridge crane for the sixth level hydropower station on the Nan'ou River. Our company's supplied equipment runs well and has received unanimous praise from the owners, making contributions to the construction of the Nan'ou River Basin
MQ600B elevated gantry crane
175t+175t double trolley bridge crane for Nanuojiang fifth level hydropower station
Southern Europe River Level 6 Hydropower Station 150t+150t Double Small Car Bridge Crane
HL240-2S3000L mixing plant of Nanuojiang 4th level hydropower station