The Nam Ou River Cascade Hydropower Station project in Laos will be developed in two phases according to the "one reservoir and seven stages" plan, with a total installed capacity of 1.272 million kilowatts and an average annual power generation of about 5 billion kilowatt hours. At present, all seven level hydropower stations have been put into operation for power generation, which will ensure 12% of Laos' electricity supply and help Laos build a "Southeast Asian battery".
Our company has provided 2×1600kN one-way gantry cranes and other gantry crane equipment totally of 6 sets, as well as one set of HL240-2S3000 mixing tower and one set of HL240-2S3000 mixing tower, for the first and fourth level hydropower stations; Provide one set of 175+175/10t overhead crane for the fifth level hydropower station and one set of 150+150/10t overhead crane for the sixth level hydropower station. Our company's supplied equipment runs well and has received unanimous praise from the owners, making great contributions to the construction of the Nam Ou River Basin.
175t+175t double trolley overhead crane for Nam Ou River fifth level hydropower station
150t+150t double trolley overhead crane for Nam Ou River sixth level hydropower station
HL240-2S3000L mixing plant of Nam Ou River 4th level hydropower station