Home Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Case Study Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Domestic Projects Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Fengshan Reservoir
Fengshan Reservoir

Fengshan Reservoir is located in Fuquan City, Qiannan Buyi and Miao Autonomous Prefecture, Guizhou Province. The roller compacted concrete gravity dam has a maximum height of 90.0m, a dam crest elevation of 912.00m, and a dam crest length of 281.0m. The project construction period is 38.5 months, with a total construction volume of approximately 410000 m ³ for roller compacted concrete and 160000 m ³ for regular concrete. The concrete production system of Fengshan Reservoir is equipped with an HL240-2S3000L hydraulic pre cooled concrete mixing plant and its ancillary equipment, which is designed, manufactured, installed and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., 

凤山水库HL240-2S3000L-2.jpg

Return To List
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd