Home Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Case Study Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Domestic Projects Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Qiandao Lake Diversion Project
Qiandao Lake Diversion Project

The Qiandao Lake Water Diversion Project, also known as the Hangzhou Second Water Source Qiandao Lake Water Distribution Project, is a key engineering project of Hangzhou's three-year action plan (2014-2016) for flood prevention and water supply protection. Received the Zhan Tianyou Award for Civil Engineering in the Second Batch of the 20th China Civil Engineering Awards. The 2×630kN two-way gantry crane is designed, manufactured, installed, guided, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co.,Ltd.

千岛湖配水工程2×630kN双向门机.jpg

Return To List
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd