The Nianpanshan Water Conservancy and Hydropower Hub Project in Hubei Province is one of the 172 major water conservancy projects designated by the State Council for water-saving and water supply. The construction tasks mainly focus on power generation and shipping, while also taking into account irrigation and water supply. The total storage capacity is 877 million cubic meters, the total installed capacity of the power station is 180 megawatts, the irrigation area is 462900 acres, the annual water supply is about 100 million cubic meters, and the annual output of green and clean electricity is 616 million kilowatt hours. The D3062K10 (MQ900B) D3050K7 (MQ600B) portal crane in the project is designed, manufactured, installed, guided, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd.