The Baihetan Hydropower Station is located in Ningnan County, Sichuan Province and Qiaojia County, Yunnan Province. It is the second cascade hydropower station developed in the lower reaches of the Jinsha River, mainly for power generation, with comprehensive benefits such as flood control, sediment interception, improvement of downstream navigation
conditions, and development of reservoir navigation. The four sets of HL360-4S5000L self falling hydraulic pre-cooled concrete mixing towers of the hydropower station are designed, manufactured, installed, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co.,Ltd.Panoramic view of concrete production system
Panoramic view of concrete production system
HL400-4F5000L concrete mixing plant