Saint Gavan Hydropower Station in Peru

The Saint gavan hydropower station is the first hydro power project under construction by the Sinohydro 6th Bureau in Peru, with a total installed capacity of 209.3 megawatts. Two impulse hydro generators are installed in the underground powerhouse, with a designed annual power generation of 1.25 billion kilowatt hours. The 125t+125t/10t overhead crane of the Saint gavan hydropower station in Peru is designed, manufactured, installed, guided and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd.

秘鲁圣家旺125t+125t桥机.jpg