Qiandao Lake Diversion Project

The Qiandao Lake Water Diversion Project, also known as the Hangzhou Second Water Source Qiandao Lake Water Distribution Project, is a key engineering project of Hangzhou's three-year action plan (2014-2016) for flood prevention and water supply protection. Received the Zhan Tianyou Award for Civil Engineering in the Second Batch of the 20th China Civil Engineering Awards. The 2×630kN two-way gantry crane is designed, manufactured, installed, guided, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co.,Ltd.

千岛湖配水工程2×630kN双向门机.jpg