At the time of spring blossoming, the liaison meeting for the design of bridge cranes and ancillary equipment for the main plant of Indonesia Jatigde Hydropower Station undertaken by our company was recently held in Hangzhou. The meeting was attended by representatives of China Electric Construction Group 10th Engineering Bureau Co., Ltd, China Electric Construction Group Northwest Survey and Design Institute Co.
The meeting reviewed and discussed the drawings provided by our company, discussed the approval opinions of the owner and the engineer on the design report (CDR), bridge calculation report (CCR) and drawings of the 200t main plant bridge constructed by our company, and also confirmed the outstanding issues in the contract.
Indonesia Jatigde Hydropower Station is China's first hydropower project in Indonesia, located in the "One Road, One Belt", the construction standards are all in strict accordance with international standards, such as the successful implementation of the project will have a very good role as a benchmark demonstration. The successful convening of this design liaison meeting will lay a good foundation for the follow-up work of the project.