The JATIGEDE HPP hydropower project is located in Shuangmudan County, West Java Province, Indonesia. The main projects include the construction of diversion tunnels, pressure regulating shafts, power plants, as well as the procurement and installation of hydroelectric generators. The installed capacity of the power station is 110 megawatts, with an annual power generation of 450 million kilowatt hours. This is the second largest water conservancy project in Indonesia. The 200/50/10t overhead crane for the JATIGEDE HPP Hydropower Station in Indonesia was designed, manufactured, installed, guided, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd.