The Lesotho Highlands Water Supply Project (LHWP) is a cooperation project between the governments of Lesotho and the Republic of South Africa. The main objective of the project is to transport approximately 70m3/s of water from Lesotho to Jiadeng, South Africa within 30 years. The concrete production system configuration of the Lesotho Highlands Water Supply Project includes two HZ90-1S1500 forced concrete mixers, which are designed, manufactured, and debugged by Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd.
African Dam Association visits construction sites
Overlooking the dam and concrete mixing system of the McTron project