Cambodia's Ganzai Hydropower Station, the largest hydropower station in Cambodia, is the first overseas hydropower investment project developed by China's hydropower industry through BOT (Build Operate Transfer) investment. For the roller compacted concrete gravity dam, with a maximum height of 112M, a dam crest length of 568M, and a storage capacity of 717.3 million cubic meters, our company provides one HL320-2S4500 mixing plant and one HZ120-2S1500 mixing plant for the production of roller compacted concrete for the dam.
Kamchay hydropower station
HL320-2S4500 Concrete Mixing Plant