Home Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Case Study Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Domestic Projects Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd Yellow River Xiaoxia Hydropower Station
Yellow River Xiaoxia Hydropower Station

Yellow River Xiaoxia Hydropower Station

           4000KN dam top gantry crane for Yellow River Xiaoxia Power Station

2 × 1000kN tailwater bidirectional gantry crane

Return To List
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd
  • Hangzhou Jianghe Mechanical & Electrical Equipment Engineering Co., Ltd